Richmond Fire Station 21

Work on Fire Station 21 in Richmond, Virginia, started the way these projects usually do. Early, before anything is visible, with underground work that sets the foundation for everything that follows.

ODM carried both mechanical and plumbing scopes for this project from the beginning. That includes everything behind the walls and beneath the floors that allows the building to function day to day. Water systems, drainage, storm piping, and radiant floor heating were installed first, below grade, before the structure began to rise.

As the building came up, coordination across trades was already in motion.

On the mechanical side, the system was designed to control temperature and airflow across different areas of the station. A VRF system allows for independent heating and cooling by zone. A DOAS unit brings in and conditions fresh air. VAVs regulate how that air is distributed. Plymovent was included to manage exhaust and air quality in areas where it matters most for a fire station environment.

We partnered with M&R for ductwork and air distribution, keeping everything aligned as the building structure and systems came together.

“Old Dominion Mechanical has consistently demonstrated professionalism, reliability, and a strong commitment to project success,” said Brett Thompson, Project Executive at Gilbane Building Company.

As the project moved forward, the focus shifted from coordination to execution. Mechanical rough-ins, piping, and system layout had to land correctly to keep the job moving without delays or rework.

“Their knowledge of HVAC, piping, and mechanical systems is evident in the precision of their work and attention to detail,” Thompson said. “They adhere closely to design intent and local codes.”

That level of precision affects more than just the systems themselves. It impacts the pace of the entire project.

“The team consistently meets milestone dates and understands how their work impacts downstream trades,” Thompson added, noting their ability to maintain overall project momentum.

By the time the project reached final install, the structure was complete, systems were connected, and everything tied back to the work that started below grade.

Richmond Fire Station 21 came down to carrying the work all the way through. Starting with a solid foundation, staying coordinated throughout, and delivering systems that function the way they’re supposed to once the building is in use.